Gezhouba Dam unleashes water in flushing test

2026-05-31 21:05:48
By Liu Yifan

On May 28, the Gezhouba Dam conducted a silt-flushing test. Torrents of water thundered out, demonstrating the engineering power of the first major water conservancy project built on the Yangtze River.
 
Video credit: Wechat video account: @灰色调的心情

Social Media